Mi Taco Loco! expands only where the supply chain, training capacity and audit bandwidth already exist. Four markets are in scope, and each moves through the same six-phase sequence.
Where the recipe library, live-fire discipline and four-format ladder are validated under real rent, labour and supply conditions. All illustrative figures on this site are Philippines planning figures.
Prove express-format repeatability across at least three catchment types
Establish the flagship as the market training and certification venue
Lock domestic supplier alternates for proteins, tortillas and chili inputs
Build the catering and events revenue layer in dine-in units
Scale market, disclosure-led
United States
The largest opportunity and the most regulated entry. Any franchise activity proceeds only through required federal and state disclosure processes, with registration where applicable.
Complete legal, disclosure and registration work before any offer is made
Re-underwrite every unit model to local rent, wage and delivery-commission reality
Select one metropolitan pilot corridor rather than dispersed opportunistic units
Build a regional supply chain with tested alternates before area development
Adjacent scale market
Canada
Similar guest behaviour to the U.S. with province-level disclosure regimes and distinct labour and import considerations. Bilingual requirements apply in specific provinces.
Province-by-province disclosure and compliance review
Bilingual menu, signage and training assets where required
Cold-weather format adaptation for seating, queuing and patio use
Import and duty analysis for controlled proprietary inputs
Destination & tourism market
United Arab Emirates
A high-density, mall-led and tourism-driven market well suited to kiosk and express formats alongside a single destination flagship.
Halal-compliant sourcing and full menu re-specification where required
Mall landlord relationships and fit-out approval pathways
Kiosk and express density strategy around footfall anchors
Multilingual service standards for a highly international guest base
Phase Model
Validate → Protect → Pilot → Systemize → Area Development → Selective Scale
No market skips a phase. A phase closes only when its outputs exist in writing and have survived a real trading period.
01
Validate
Prove the unit economics and guest behaviour in the home market across more than one catchment type. Nothing scales before the model survives a full trading year.
Phase Outputs
· Stabilised trading data by format
· Recipe library frozen and version-controlled
· Labour model and station certification proven
02
Protect
Secure the brand, recipes, marks and systems in every target jurisdiction before any conversation about territory.
Phase Outputs
· Trademark filings by market and class
· Recipe, spec and manual confidentiality framework
· Legal structure and disclosure roadmap per country
03
Pilot
Open a small, controlled set of units in a single corridor with heavy support, and measure what breaks.
Phase Outputs
· Corridor pilot units with intensive support presence
· Revised opening critical path based on observed friction
04
Systemize
Convert everything learned in the pilot into the manual, the training path and the audit programme.
Phase Outputs
· Fourteen operations-manual modules updated and reissued
· Training certification tracks and assessment tooling
· Audit programme, scoring and remediation ladder in force
05
Area Development
Award multi-unit territories with scheduled development, matched format mixes and enforceable performance criteria.
Phase Outputs
· Territory maps and development schedules
· Format-mix plans anchoring kiosks and express units to a dine-in unit
· Partner qualification and capital verification standards
06
Selective Scale
Grow only where supply chain, training capacity and audit bandwidth already exist. Discipline over unit count.
Phase Outputs
· Growth gated on support capacity, not demand alone
· Regional training venues before regional unit growth
· Continuous re-underwriting of every new market's economics
180-Day Roadmap
From qualified applicant to a stabilised opening
An indicative sequence. Actual timing depends on site availability, permitting, construction conditions and the applicable disclosure process in the relevant jurisdiction.
Days 0–30
Qualification & Alignment
· Application review, capital verification and market interest confirmation
· Mutual non-disclosure and disclosure-process briefing
· Preliminary territory and format-mix discussion
Days 31–60
Underwriting & Site Search
· Site criteria matrix issued and search begun
· Local re-underwriting of the unit model with real rent and wage inputs
· Supplier landscape and alternate sourcing review
Days 61–90
Documentation & Site Approval
· Required disclosure documents delivered where offers are lawfully made
· Site scoring, landlord negotiation support and approval decision
· Format kit selection and preliminary drawings
Days 91–120
Design & Build
· Drawing review gates, permits and contractor mobilisation
· Equipment ordering, long-lead item tracking
· Hiring plan launched and manager candidates identified
Days 121–150
Training & Fit-Out Completion
· Owner and manager certification programmes completed
· Crew hiring, station training and live-fire grill certification
· Equipment commissioning and grill calibration
Days 151–180
Launch & Stabilisation
· Friends-and-family service and soft opening
· Grand opening campaign and local marketing activation
· Opening team on site through the first trading weekend, then stabilisation review